PLN (Indonesia) Charging Stations in Babakan Madang
3 PLN (Indonesia) EV charging stations in Babakan Madang, Indonesia. Connector types, reliability scores, and opening hours.
- Home
- 🇮🇩 Indonesia
- Jawa Barat
- Babakan Madang
- PLN (Indonesia)
3 stations
Connectors Type 2 ×7 CCS ×2
01
Bigland Sentul
60kW
PLN (Indonesia)
IDR 2467/kWh ++ CCS · 60kW ×2
Connectors
CCS · 60kW ×2
- Address
- Kawasan Industri Sentul
- Network
- PLN (Indonesia)
- Points
- 1
- Hours
- available
- Pricing
- IDR 2467/kWh ++
02
Pancar Garden
22kW
PLN (Indonesia)
Type 2 · 22kW ×2
Connectors
Type 2 · 22kW ×2
- Address
- Pancar Garden,
- Network
- PLN (Indonesia)
- Points
- 1
- Hours
- available
03
SPKLU Hotel Bigland
22kW
PLN (Indonesia)
Type 2 · 22kW ×5
Connectors
Type 2 · 22kW ×5
- Address
- Sentul
- Network
- PLN (Indonesia)
- Points
- 1
- Hours
- available